Project Content and Scale:
Length 36M, Width 10M,Height 10m
The completion time of steel structure office building is 2015
Project Introduction:
The steel structure office building is in Africa
The front of the building is glass curtain wall
The inside of the building for refined decoration including water, electricity.
STEP I The following is professional drawing plan we supply for our client:
STEP II The following is the producing and packing pictures of the steel structure materials:
STEP III The following is the process pictures of installing the steel structure building:
Copyright © 2015 Honstar Construction Co.,Ltd All rights reserved. Site Map